How-to guide

How to read construction drawings

A drawing set looks overwhelming until you know how it's organised. Most US sets follow the National CAD Standard: a fixed discipline order, sheet numbers that tell you what's on each sheet, and a legend that defines the symbols.

Updated · 3 min read · Sources

On this page
  1. The order of a drawing set
  2. How to read a drawing set, start to finish
  3. Reading a sheet number
  4. Plans, elevations, sections and details
  5. Check the scale on every sheet
  6. Symbols: the legend is the authority
  7. Revisions and clouds
  8. Taking off from the drawings in ContractorCounter
  9. Questions
  10. Sources

Free preview, no card. Nothing is saved or exported until you subscribe, from US$1 a week, billed US$4 every 4 weeks.

The order of a drawing set

The drawing sheet index order from the US National CAD Standard (v6). Most sets use only some of these disciplines.

The order of a drawing set
DesignatorDisciplineWhat you'll usually find
GGeneralCover sheet, sheet index, code analysis, general notes and legends
HHazardous MaterialsHazardous materials surveys and abatement
VSurvey/MappingExisting site survey
BGeotechnicalSoil borings and geotechnical data
CCivilGrading, paving, drainage, storm sewer and site utilities
LLandscapePlanting and hardscape
SStructuralFoundations, framing, structural sections and details
AArchitecturalFloor plans, roof plan, elevations, wall sections, details
IInteriorsFinish plans, reflected ceiling plans, interior elevations
QEquipmentEquipment plans, such as food service
FFire ProtectionSprinkler and fire protection layouts
PPlumbingPlumbing plans, schedules and details
DProcessProcess systems
MMechanicalHVAC plans, schedules and details
EElectricalElectrical and lighting plans, schedules and details
WDistributed EnergyOn-site energy systems
TTelecommunicationsData and communications
RResourceResource documents
XOther DisciplinesAnything not covered above
ZContractor/Shop DrawingsShop drawings from contractors
OOperationsOperations documents

How to read a drawing set, start to finish

  1. 1

    Start with the general sheets

    Find the sheet index, general notes, abbreviations and legends on the G sheets.

  2. 2

    Read the title block

    Check the project, sheet title and number, scale, and the latest revision on each sheet.

  3. 3

    Work through the disciplines in order

    Civil and landscape, structural, architectural, then fire protection, plumbing, mechanical and electrical.

  4. 4

    Follow the callouts

    Use section and detail callouts on the plans to jump to the sheets that show more.

  5. 5

    Check the revisions

    Look for revision clouds and compare them with the revision list before you price.

Reading a sheet number

A National CAD Standard sheet number is the discipline letter, then a sheet type digit, then a sequence number. The sheet types are: 0 general, 1 plans, 2 elevations, 3 sections, 4 large-scale views, 5 details, 6 schedules and diagrams, 7 and 8 user defined, and 9 three-dimensional drawings. So A2.00 is an architectural elevation sheet, and P2.01 is a plumbing sheet. A second letter can narrow the discipline: QF is food service equipment, EL is electrical lighting.

Plans, elevations, sections and details

A plan looks down on the building, cut horizontally, usually a few feet above the floor. An elevation looks straight at a face of the building or a wall. A section is a vertical cut through the building that shows how it's put together. A detail is a close-up, at a larger scale, of one junction or assembly. Callout symbols on plans point you to the section or detail sheet that shows more.

Check the scale on every sheet

Every sheet, and often every view on a sheet, states its scale. A set mixes scales, from small-scale site plans to large-scale details, so never assume one scale for the whole set. If you measure from a PDF, calibrate each sheet against a printed dimension rather than trusting the stated scale, because PDFs are often rescaled when they're printed or exported.

Symbols: the legend is the authority

There is no single symbol set every firm uses. The ASME standard for plumbing fixture symbols, Y32.4, is listed as historical, and electrical and mechanical symbols vary between engineers too. Each set defines its symbols in a legend, usually on the general sheets or on the first sheet of each discipline. Read the legend before you count anything.

Revisions and clouds

Changes are shown with a revision cloud, a scalloped outline around the changed area, usually with a revision number or delta symbol that matches the revision list in the title block. When a new issue arrives, look for the clouds first: they show what changed since the last set you priced. The same conventions mark field changes on as-built drawings.

Taking off from the drawings in ContractorCounter

Once you can read the set, ContractorCounter turns it into quantities. Open the PDFs in the browser, calibrate each sheet, then measure and count the symbols from the legend; the AI can take the first pass with a marker on every symbol for you to review. Everything feeds a Bill of Quantities you can price. See the takeoff workflow; plans start at US$1 a week, billed US$4 every 4 weeks.

Questions about How-to guide

What does A1.01 mean on a drawing?

Under the US National CAD Standard: A is the discipline (architectural), 1 is the sheet type (plans), and 01 is the sequence number. So A1.01 is an architectural plan sheet, often the first or second floor plan.

What order are construction drawings in?

The National CAD Standard order starts with general (G), then hazardous materials, survey, geotechnical, civil and landscape, then structural (S), architectural (A), interiors, equipment, fire protection, plumbing (P), process, mechanical (M), electrical (E) and the rest.

Where are the symbols explained on a set of drawings?

In the legend, usually on the general sheets or the first sheet of each discipline. Symbols vary between firms, so always use the set's own legend.

See whether it fits your next job.

Start with your own drawing in the free preview. No card required.

Try it free

Sources

The sheet order, discipline letters and sheet type numbers come from the US National CAD Standard tables as reproduced in a City of Dallas plan-review document. The status of the plumbing symbol standard was read from the ANSI webstore.

Reviewed

Not every firm follows the National CAD Standard exactly, and every drawing set defines its own symbols. The set's own index and legend always win.

Your drawings. Your rates.
Your next quote.

Mark up and measure a drawing free in the preview. Subscribe to keep the quantities and build a quote with your own rates, right in your browser.

Free preview, no card. Nothing is saved or exported until you subscribe. There is no trial.