14 September 2026
What's new in ContractorCounter: September 2026
Faster drawing work, more reliable AI takeoffs, cleaner exports, and new workspace actions are now available in ContractorCounter.
Blog
Practical articles for contractors working through drawing review, measurement, takeoff, and quote preparation.
14 September 2026
Faster drawing work, more reliable AI takeoffs, cleaner exports, and new workspace actions are now available in ContractorCounter.
10 September 2026
Learn how to estimate bamboo building construction projects, from structural grading and joint counting to managing unique material takeoffs.
7 September 2026
Discover how browser-based construction takeoff software simplifies drawing measurements and exports without complex desktop installations.
3 September 2026
Wondering how accurate AI takeoff software really is? Learn the truth about AI limitations, the necessity of human reviews, and how to verify your results.
31 August 2026
Learn the fundamentals of construction estimating, from reading drawings to building a bill of quantities, with this beginner-friendly guide.
24 August 2026
Learn how to use digital estimating software to transition from drawing markups to a complete, accurate Bill of Quantities for your construction bids.
20 August 2026
Discover how modern estimating programs streamline your bidding process with digital takeoffs, smart markups, and instant bill of quantities exports.
18 August 2026
Learn how to select the right construction estimating software to build fast bids, organize materials, and win more profitable jobs.
4 August 2026
Seven-step QC takeoff checklist for estimators: verify plans, calibrate scales, separate quantities, apply waste, document exceptions, and validate the BoQ.
27 July 2026
Calibrate, measure, read Markups list totals, then Quantity Link to Excel — which needs Complete or Max. The full Revu workflow and where it stops.
27 July 2026
Document > Unflatten only works if Allow Markup Recovery was ticked at flatten time. What to do when it was not, and how reversible flattening differs.
27 July 2026
Open the Markups list, click Summary and choose CSV — that opens in Excel. The steps, the options to set, and what Revu 20 end of support changes.
17 July 2026
Compare the best construction takeoff software for 2026. See which tools win on speed, accuracy, and cloud collaboration—and which one to try first.
9 July 2026
Revu 20 support ended July 31, 2026; Studio access ends December 31. Here's the migration itself: what to do before Studio goes, where every Revu habit lands in a browser-based tool, and what genuinely has no replacement.
7 July 2026
Revu 20 passed end of support on July 31, 2026; end of life follows on December 31 — two different dates that even Bluebeam's own pages mix up. What just broke, what still works until December, what your perpetual license is still good for, and the real 3-year cost of each option.
7 July 2026
What markups on construction drawings mean, the types and colour conventions contractors actually use, and how to track markup changes across a project.
7 July 2026
A plain-English look at what AI estimating and takeoff software actually does on real construction drawings — and the parts of the estimate that still need a human.
23 June 2026
A practical workflow for measuring slab, footing, and path concrete quantities from construction drawings before requesting supplier quotes.
23 June 2026
A short checklist for contractors turning marked-up drawings into supplier quote requests and bill of quantities inputs.
11 June 2026
An honest 2026 comparison of seven Bluebeam alternatives for contractors — browser-based and desktop — with pricing, platforms, and the cases where keeping Revu is the right call.
Put it to work on your next job
Start one project free. Measure your drawings, review the quantities, and build a quote with your own rates — right in your browser.
No card for your free project. Exports and sharing require a paid plan or an eligible 3-day trial. Card required for the trial.