How to Read a Door Schedule (Plus Window and Finish Schedules)
What a door schedule is, what every column means, an example schedule read line by line, how window and room finish schedules work, and how estimators count doors against the schedule.
The short answer: a door schedule is a table on the architectural drawings that lists every door in the building by its mark (the tag shown on the floor plan, such as 101 or D1). Each row gives that door's size, type, material, frame, fire rating and hardware set. To read it, find a door's mark on the plan, then read across its row. Window schedules and room finish schedules work the same way.
What a door schedule is for
Floor plans show where each door is, but there is no room on the plan for everything a supplier needs to know. So the plan shows only a small tag, the door mark, and the schedule carries the detail. One row per door (or per door type, on smaller jobs) keeps the information in one place, where the architect can update it and the estimator, supplier and installer all read the same thing.
You will usually find the door schedule on an architectural sheet near the front of the set, often on the same sheet as the window schedule and the door and frame type elevations.
What each column means
Column order varies by office, but most door schedules carry these:
- Mark (or number): the tag shown on the plan. Many offices number doors after the room they open into, so door 101 serves room 101.
- Location or room: which room the door belongs to, as a check against the plan.
- Width, height and thickness: the door leaf size, for example 3'-0" × 7'-0" × 1¾". A pair of doors is often written as 2 @ 3'-0".
- Door type: a letter or number that points to a door elevation drawing (flush, half-glazed, full-glass, louvered).
- Door material and finish: common abbreviations are WD (wood), SC (solid core), HC (hollow core), HM (hollow metal) and AL (aluminium).
- Frame type and material: the frame is scheduled separately because a wood door can hang in a hollow metal frame.
- Fire rating: for doors in fire-rated walls, stated in minutes or hours, such as 20 min, 45 min, 60 min or 90 min. The door, frame and hardware must all carry the rating.
- Hardware set: a code (HW-1, HW-2) that points to the hardware specification or a separate hardware schedule listing the hinges, lockset, closer and stops.
- Remarks: anything that does not fit elsewhere, such as an acoustic rating, a vision panel, an access-control reader or "by owner".
An example, read line by line
This short schedule is illustrative, not from a real project.
| Mark | Room | Size (W × H × T) | Type | Door | Frame | Fire rating | Hardware | Remarks |
|---|---|---|---|---|---|---|---|---|
| 101 | Lobby | Pair, 3'-0" × 7'-0" × 1¾" | C | AL / glass | AL | — | HW-1 | Card reader |
| 102 | Office | 3'-0" × 7'-0" × 1¾" | A | SC WD, stain | HM | — | HW-2 | |
| 103 | Corridor to stair | 3'-0" × 7'-0" × 1¾" | B | HM, paint | HM | 90 min | HW-3 | Vision panel |
| 104 | Store | 3'-0" × 7'-0" × 1¾" | A | SC WD, stain | HM | — | HW-4 |
Read door 103 like this: the door that opens off the corridor into the stair is a single 3'-0" by 7'-0" hollow metal door, painted, in a hollow metal frame. It is type B (look up the type B elevation to see the vision panel), it must carry a 90-minute fire rating, and its hinges, lockset and closer are listed under hardware set HW-3.
Two things trip people up. First, the schedule and the plan must agree: if a door appears on the plan with no row in the schedule, or the schedule lists a door you cannot find, that is a question for the architect before you price it. Second, a "pair" is two leaves but one opening, so be clear whether you are counting doors or openings.
Window schedules
A window schedule works the same way. The plan shows a window mark (often a letter, or W1, W2) and the schedule gives, for each mark:
- Size, width by height, and sometimes the rough opening.
- Type, such as fixed, casement, awning, double-hung or sliding, usually pointing to window elevations.
- Frame material, such as aluminium, vinyl, timber or steel.
- Glazing, including any tempered or safety glass and the performance values the energy code requires.
- Head or sill height, and remarks such as egress windows in bedrooms.
Many schedules are combined into a single "door and window schedule" sheet.
Room finish schedules
A finish schedule lists every room with the finish for each surface: floor, base, each wall (sometimes by compass direction), and ceiling, with the ceiling height. Codes such as CPT-1 or PT-2 point to the finish specification, which names the product and colour.
For an estimator, the finish schedule is what turns a measured floor plan into a priced one. Measure each room's floor area and wall perimeter, then read the finish codes from the schedule to know which rate applies. Our construction takeoff example works through those measurements for one room.
How estimators use the door schedule
The schedule tells you what each door is; the plan tells you how many there are. A door takeoff needs both:
- Count every door tag on the plans, grouped by mark or type.
- Check each group against the schedule so every door on the plan has a row, and every row has a door.
- Total by type, because doors are priced by type, size, material and rating, not one by one.
- Count the hardware sets from the same totals, since one set usually serves one opening.
On a PDF this is a counting job. In ContractorCounter you click each door tag with the count tool, keeping a separate count group for each mark or type. Where the tags are real text in the PDF, text search finds every match and can turn the matches into counts; where they are drawn as graphics, visual search finds them from a sample you capture. The totals land in the bill of quantities, ready for rates. Reading the rest of a drawing set is covered in how to read construction drawings.
FAQ
What is a door schedule in construction? A table on the architectural drawings that lists every door by its mark, with its size, type, material, frame, fire rating and hardware set. The floor plan shows the mark; the schedule holds the detail.
What does HM mean on a door schedule? Hollow metal, a pressed-steel door or frame. Other common abbreviations are WD (wood), SC (solid core), HC (hollow core) and AL (aluminium).
What is a hardware set on a door schedule? A code, such as HW-3, that points to the list of hardware for that door in the specification or a hardware schedule: hinges, lockset, closer, stops and any access control.
What is the difference between a door schedule and a finish schedule? A door schedule describes each door. A room finish schedule describes each room's floor, base, wall and ceiling finishes and its ceiling height.